Installing Marmoleum - A Step-by-step guide

This information is to educate you on the installation process for a Marmoleum Floor to.

The first thing you need to know is that Marmoleum is available in several products, each with a different installation.

Let's start with the Marmoleum Click Start Flooring

Marmoleum Click flooring requires a distance of 3 / 8 "around the floor laid.

The 3 / 8 expansion gap allows the floor to expand as needed.

Marmoleum has to get usedthe house between 2-6 days prior to installation. 2 days is typical, but 4-6 days is suggested for the winter.

When installing over concrete, you discover that the concrete is dry enough for installation at the end.

Once this is done, you install a vapor barrier over the concrete. This is a prerequisite.

In order to test concrete for moisture, use a moisture an approved test

Tools and materials needed:

A hammer, straight back hand saw, keyhole saw orJig saw, tape measure, pencil, wedges, fitting wedges, tapping block, tension iron (crowbar), and a table saw and / or chop saw would be nice.

Be sure to read and follow all directions in the appropriate field.

All the spaces between the developing and Marmoleum Click walls, the doorway transition or other fixed objects such as pipes for radiators, sinks or toilets MUST be sealed with 100% mildew resistant silicone.

When installing over a concrete subfloor or a subfloor withUnderfloor heating, they cover the surface with a vapor barrier.

- The coverage area must be 3 / 8 "wide and completely sealed trim with 100% mildew sealant before installing the wall.
- If a floor drain or sump pump is present --
DO NOT INSTALL Marmoleum click on that level.

- A T-Mold must be completely installed in the door between rooms and expansion space filled with the proper sealant. Large areas can be an additional extensionRoom.

The room temperature should be at least 68 F or 20 degrees Celsius, relative humidity approx. 40-60%.

Marmoleum click installed without glue. By using a Tongue in Groove, click on System. Marmoleum Click flooring is very easy to fit.

The first row of panels is installed along the wall, where the first plate is positioned in the left corner of the room. Remember, a distance of 3 / maintain 8 "on the wall.

The second panel is nownext to the first panel with the short side placed easily and seamlessly placed into the side of the panel is already threaded together between the two sides.

Make sure that the panels or tiles in the first row are straight.

Next panel after panel, over the entire width of the room. Once you've reached the end of the first line is cut, the last plate in the first line the exact length, remember to leave the corresponding 3 / 8 "gap. Then you start installing the second row, cut the starter --Panel to a length of approx. 24 "to create a tiered look, this notice is not required if the installation of the 12 x12 click on tiles.

Now start your second row, you do not click the new line in the front row at this time. Getting continue side by side, as previously done in the first row. After the second line is completed, and with the help of wedges or any other person, move the entire 2nd Against the entire first row, lift the entire second line and press it into the groove of the first whole line.Next click below on the second line until it snaps into place.

Continue now on a number after the installation after this episode. Please note that it is important to the end joints a minimum of 12 "to create one stagger stagger.

Also, be sure to remember to leave to a minimum 3 / 8 "gap at all vertical obstructions.

To fit the last row to the last row in place to place, put the last line on the subfloor installed next to the last line and connect the long sides with the help of the voltageIron.

Installed After completion, the base or quarter round molding is used to cover the expansion joints throughout the room. The floor is accessible, immediately after installation. Please note this is only a clue. Current systems are instructions in each package provided.

Please note, in any way, I suggest that you install Marmoleum in a glue down application, especially when involving multiple pages, should tackle.
For Complete Step by StepInstructions for installing an adhesive Down Marmoleum floor. Click here: Installation of sheet material [http://www.gatewayfloors.com/Marmoleum_Installation_Step_By_Step_Guide.htm]

Or even better, it installed professionally. Do you need a professional contractor? I do not know where should I start?

Be sure to read my article, "Biggest 5 Tips for a reliable contractor" finding reliable contractors

marketing strategies management training process equipment

Danos tu comentario