The cement is mixed to create specific purposes for which they are widely used. And 'one of the most commonly used materials in the world and is often used for driveways, roads, sidewalks, pavement, buildings and strengthen for various other uses in the construction industry. Volume of cement needed is more, there are some techniques to keep order, to produce good concrete.

Take a look at some helpful tips on a trailer with mixture of cement-mixer

First, add about 12Liters of water, depending on the type of cement mixture. Cement should go in after a few clusters. Continuous work, the ratio of ingredients for each type of concrete work is underway. Watch the latest against the lower units, as this only leads to problems with fall, ruin the appearance of concrete, after you paid. Also, more importantly, do not get the concrete mix to wet, reduces the strength of this and there will be less able to resistWeathering in the future.

Take the material in the mixer, instead, constantly wire over the edge. This is the material, solid at the back to prevent the drum, and will then be distributed only to stop the mixer. Mixing the appropriate time for concrete is 2 and a half minutes from time when all materials, including water, entered the drum. It 'important to remember not to over mix, as this is the strength reductionConcrete and aggregates will cause separation of coarser.

Always make sure to keep your mixer clean, because the slightest trace of material in the drum and make it harder every time I use the residue. This will ultimately make the machine unusable. to clean throw stones into the mixer drum. The best method is with 19mm clean gravel and water.

Cement mixing rule

Volume

Most show the mixer brochureProduction in liters. (Example 260 liters) and the amount of concrete needed for the job at hand is usually measured in cubic meters. A cubic meter of concrete is 1,000 liters. Therefore, if your machine is rated at 260 liters, 0.26 cubic meters can produce the mix.

Production

The mixing cycle is the time needed to fill the machine, mix the cement and unloading. Most of the brochure shows a concrete mixing cycle of 2-3Minutes. This is not an exact number for all purposes. When using the standard mixer grinder, use about 6 minutes in a combined cycle. This will help you assess how long you are prepared to consider all the evidence is necessary if the volume output a. This is especially useful when I have Knowledge in the setting of a cement mixer.

There are different textures and strengths of concretedifferent uses. Low-strength concrete is usually used for home. Some applications of medium strength of the concrete floor of the building, sidewalks and driveways. Concrete High-strength, is suitable for concrete and heavy soil. Mortar, bricks and blocks used for that. On average, you will need three pieces in 1000 bags of cement and 0.6 cubic meters of sand. Cement is also commonly used for plastering!