If a routine inspection of the plant shows worrying signs of infiltration of water, facility managers must take the necessary measures to alleviate the problem. Water damage can weaken the structural integrity of the building, threatening the health and safety of building users and the opportunity to expose to the risk of breaches of building regulations.
Signs of problems with waterproofing
Trader sealing the building can see exactly sealing system failuresthrough a comprehensive review. But facility managers can settle the problems caused by these visible signs at:
First wet basement walls and floors. A sign of infiltration of moisture still comes from above or below ground.
Second mold and fungus growth. microorganism colonies in some areas of the building: a source of moisture feeding its growth.
Third red wooden or concrete materials fall, a sign thatPresence of moisture is to change the temperature and humidity.
fourth pool of water. Water brought by bad weather in time disappear. If the pool of their residence, means that there is an error in the trading system to seal.
The importance of sealing
Road works are potentially due to a failure of the trading system to seal in question. The importance of the seal is summarized below:
Before Prevents waterEntry seal any possible way that water can penetrate - roofs, walls, decks, and basements, to name a few.
Secondly, "allow the building to breathe." When the bound water in the building, which can be channeled through drains and breaths.
Third, it maintains the quality. The growth of harmful microbes and water-borne prevent danger to the environment, the interior air quality.
Fourth, it maintains a comfortable interior climate.Water is entering the palace refused to avoid sudden changes in temperature HVAC system work harder to compensate.
Keep fifth structural integrity. Unable to carry water long enough to rot and weaken the material foundations.
When it comes to waterproof a building?
Here are the cases where commercial buildings lining systems to be installed:
During construction, designers take first building when requiredSystem for the entire construction process. The barrier is built into the building for the protection of greater humidity.
During the second renovation of buildings, shortly after the building is constructed.
During regular maintenance, the third building in which the system carries out regular inspections, tune-ups and the areas of re-construction of services and facilities to ensure their condition.
During the fourth building rehabilitation as an example, if you add a feature construction, or arrangement of the buildingchanged. The closing trading system must be installed to accommodate the renovation.
If necessary, fifth, or damage, emergency situations such as floods, fires or disasters.
Seals for commercial buildings
Designing a system of barrier against the ingress of water are often associated to the different ways that water can potentially enter the building.
In the case of infiltration of groundwater into basements and low areas, theEntry point. Sealing these areas require special waterproofing basement waterproofing traders. The barrier system of the inner seal wall and attics with water proof coating.
waterproofing systems are installed in other areas of the building. Multi-Coat Systems, concrete coatings, epoxy resins and formulations bituminous Barrier System can be used in its property based on water.
Drainagecomplete system of commercial seal, if the pre-formed channels installed in the walls for the water to the outside.
barstoolshome kitchendesign
Continuar leyendo
Ocultar articulo